Named local schemes and plans, with the responsible body and the latest stage established by the source checked. A proposal, funding announcement and completed project are different things.
Perth city centre
Perth Museum redevelopment
The former City Hall has become a museum and cultural attraction in the city centre.
Opened March 2024; recorded in council performance report · source does not state a status date
Responsible body: Perth and Kinross Council and Culture Perth and Kinross
Latest evidence: The annual report records the museum opening on 30 March 2024. Opening is verified; continuing economic impact requires separate evidence.
Next thing to establish: What dated decision or progress report confirms the current stage?
Progress, funding and source
- Cost
- Not established by the evidence checked.
- Funding
- Not established by the evidence checked.
- Area covered
- No official project-to-ward mapping has been verified; no ward allocation is inferred from the city name.
No verified ward footprint is assigned.
Perth and Kinross Council Annual Performance Report 2023–24 →
Source checked 2026-10-17. A plan or announcement is not proof of completion.
Questions for the next progress report
- What is the approved cost, including ongoing maintenance?
- Which funding is committed, and what remains conditional?
- Which neighbourhoods are covered by an official project plan, and which benefits still need testing?
- What is the next published milestone, and what evidence will show residents benefit?
Connect Perth’s completed investments to everyday city access →
Connect local skills to local opportunities →
How to track delivery →North of Perth, linking the A9, A93 and A94
New Kingsway and Destiny Bridge
A new Tay crossing and walking and cycling links offer routes around the city centre.
Road and bridge officially opened · evidence dated 2025-03-31
Responsible body: Perth and Kinross Council
Latest evidence: The official council project site records opening on 31 March 2025. Reduced congestion and cleaner air are intended benefits requiring follow-up measurement.
Next thing to establish: What is the approved cost, including ongoing maintenance?
Progress, funding and source
- Cost
- Not established by the evidence checked.
- Funding
- Not established by the evidence checked.
- Area covered
- No official project-to-ward mapping has been verified; no ward allocation is inferred from the city name.
No verified ward footprint is assigned.
The New Kingsway and Destiny Bridge Officially Open →
Source checked 2026-10-17. A plan or announcement is not proof of completion.
Questions for the next progress report
- Which funding is committed, and what remains conditional?
- Which neighbourhoods are covered by an official project plan, and which benefits still need testing?
- What is the next published milestone, and what evidence will show residents benefit?
Connect Perth’s completed investments to everyday city access →
How to track delivery →West of Bertha Park High School, off Adamson Avenue, Perth
Proposed Bertha Park primary school
A new primary school, nursery and support provision were consulted on in autumn 2026. The consultation stage does not establish that the school has planning permission or an opening date.
Pre-application consultation closed 9 October 2026; next decision not verified · evidence dated 2026-09-03
Responsible body: Perth and Kinross Council
Latest evidence: The consultation ran from 3 September to 9 October 2026 and describes primary, nursery and intensive-support provision. It is an early planning stage; earlier hoped-for completion dates are not used as evidence of an opening.
Next thing to establish: What is the approved cost, including ongoing maintenance?
Progress, funding and source
- Cost
- Not established by the evidence checked.
- Funding
- Not established by the evidence checked.
- Area covered
- No verified current ward footprint is assigned. The named site or council-wide remit is not proof of benefits to every ward.
No verified ward footprint is assigned.
Bertha Park Primary School: pre-application consultation →
Source checked 2026-10-17. A plan or announcement is not proof of completion.
Questions for the next progress report
- Which funding is committed, and what remains conditional?
- Which neighbourhoods are covered by an official project plan, and which benefits still need testing?
- What is the next published milestone, and what evidence will show residents benefit?
Match Bertha Park’s growth with school places →
Make room for homes people can afford →
How to track delivery →What this local evidence covers
12 of 12 wards
Have at least one valid census comparison with the whole council. Missing measures stay visible.
Read the neighbourhood evidence →3 reviewed plans and projects
2 have a source-dated stage; 0 have some funding evidence; 0 have some cost evidence. These counts do not prove that funding or costs are complete.
Check each project →0 verified ward links
Project locations cannot be treated as a map of who benefits. Each record explains any verified ward association.
Read the sources and limits →What is still missing
The reviewed local schemes are a selected evidence collection, not a complete council capital programme.
Current service capacity, incomes, waiting lists, school demand and project outcomes need additional verified local evidence before firm claims can be made.
Project locations have not been matched to official ward boundaries. No ward-specific delivery claims are inferred.
Costs, funding and benefits are only reported where the selected official evidence states them; blank fields are not zero.
Bertha Park’s consultation has closed, but its outcome, funded construction timetable and opening date have not been verified. An earlier target date is not treated as proof that the school opened.